MahaRERA No. PC13310126014 35 · Verify at maharera.maharashtra.gov.in · Images are artist's impressions.
Sugee Lake DistrictBy Sugee Group · Thane

Frequently asked questions

Where is Sugee Lake District located?

Sugee Lake District is located opposite Korum Mall at Cadbury Junction, Thane West, Maharashtra, on a 52-acre cluster-land parcel facing Siddheshwar Lake.

What type of property is Sugee Lake District?

It is a Grade A++ commercial development — office and retail space — not a residential project. Unit sizes range from 1,000 to 6,000 sq. ft., with jodi (combined) options for larger requirements.

Who is developing Sugee Lake District?

Sugee Group is the developer. The project is designed by architect Hafeez Contractor (Padma Bhushan recipient), with structural design by SOM (Skidmore, Owings & Merrill).

How tall is the Sugee Lake District tower?

The tower is configured as basements plus ground plus 1 retail floor, 8 podium levels for surface parking, and 35 habitable floors — G+45 storeys in total.

What is the RERA registration number for Sugee Lake District?

Sugee Lake District is registered under MahaRERA No. PC13310126014 35. Buyers should verify current registration status directly at maharera.maharashtra.gov.in before transacting.

What is the floor plate size at Sugee Lake District?

The typical floor plate is approximately 46,000 sq. ft., with carpet areas across the project ranging from roughly 800 to 46,000 sq. ft. depending on configuration.

What connectivity does Sugee Lake District offer near Thane?

The project sits near the Eastern Freeway, upcoming Thane Metro, Thane–Borivali Tunnel, Gorbander Road widening, the Gaimukh–Mira Bhayander underpass, and the Balkum–Gaimukh coastal road — with the planned Mumbai–Ahmedabad bullet train corridor and Thane Ring Metro nearby.

What is the price of office space at Sugee Lake District Thane?

Office space at Sugee Lake District starts at ₹3.5 Cr onwards. Final pricing varies by unit size and view (lake-facing vs. non-lake-facing). Submit an enquiry for the current unit-wise price list.

When will Sugee Lake District be ready for possession?

The RERA-registered completion date is 2033, with the developer's internal construction target being 2030. The project is currently in the pre-launch / under-construction stage.

Is Sugee Lake District being built in phases?

Yes. The 52-acre Sugee Lake District masterplan is being developed in phases. This Grade A++ commercial tower is Phase 1 of the overall development.

Have a question not answered here? Send us an enquiry or message us on WhatsApp.

WhatsAppGet Price ListCall